RETAIN! FILL
RETAIN!
FILL
is a totally new patent pending structural engineering
concept which
has rapidly grown in use by the
building and civil
engineering
industries due to its significant
cost savings and
very short construction time
compared with retaining walls.
Our
scientists and engineers are constantly endeavouring to reduce
retaining wall
costs. As a result they have
succeeded in eliminating the retaining wall altogether!
Due to the
friction angle of soil an embankment will
have an angled side. A
retaining wall is therefore
required to create a steeper angle or a
vertical side.
The RETAIN!
FILL
solution consists of a stabilised soil
embankment. Hence no wall
is needed to acheive a vertical
side. A fasia wall of
lightweight masonry blocks is
usually
attached to the side of the RETAIN!
FILL mass, however, for aesthetic
purposes. Hence, RETAIN!
FILL can even be installed without a
wall to reduce
costs for
temporary
applications or where aesthetics are not important! The
RETAIN! FILL
solution is
installed in place of retaining walls to create a vertical,
stepped or sloping masonry
block face at a change in
level at a fraction of the
price and construction time of a
retaining wall.
Retaining
walls
usually consist of a reinforced concrete block wall and footing to
resist the
soil loads. RETAIN! FILL does
away with the footing, steel
reinforcement,
concrete, large
excavation costs (due to its narrow width), concrete setting delays
and can usually even
reuse the excavated material behind the wall. In fact, a 1.5m
RETAIN!
FILL system can usually be constructed and
backfilled in the same time
it takes to construct the concrete footing of a
retaining wall!
Making reinforced soil
technology redundant, RETAIN! FILL
can
usually reuse
the onsite soils, so you can
forget about soil disposal costs or bringing in expensive
granular fills. If it is not
practical to reuse the excavated soil we can
stabilise most
soils for use as RETAIN!
FILL. You
no longer need soil reinforcement so don't
worry about designing for
pullout and no more worries about strip
corrosion. Forget
about heavy mass concrete blocks
or reinforced concrete panels: no
longer
necessary. Every block is positively tied into
the RETAIN! FILL mass without
any
connection with the
blocks so block weight is now irrelevant. Due to its narrow
width RETAIN! FILL will
usually halve the
amount of excavation (and hence
backfilling) required, slashing
your costs again.
Less excavation, less backfilling
and
light weight blocks all amount to a significantly reduced construction
time
also!
